{"id":6606,"date":"2021-07-19T08:43:22","date_gmt":"2021-07-19T07:43:22","guid":{"rendered":"https:\/\/mapindoor.eu\/preservation-of-evidence-before-construction-measures\/"},"modified":"2021-10-29T10:09:56","modified_gmt":"2021-10-29T09:09:56","slug":"preservation-of-evidence-before-construction-measures","status":"publish","type":"post","link":"https:\/\/mapindoor.eu\/en\/preservation-of-evidence-before-construction-measures\/","title":{"rendered":"Preservation of evidence before construction measures"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;3.28&#8243; da_disable_devices=&#8221;off|off|off&#8221; global_colors_info=&#8221;{}&#8221; da_is_popup=&#8221;off&#8221; da_exit_intent=&#8221;off&#8221; da_has_close=&#8221;on&#8221; da_alt_close=&#8221;off&#8221; da_dark_close=&#8221;off&#8221; da_not_modal=&#8221;on&#8221; da_is_singular=&#8221;off&#8221; da_with_loader=&#8221;off&#8221; da_has_shadow=&#8221;on&#8221;][et_pb_row _builder_version=&#8221;4.9.4&#8243; custom_margin=&#8221;|8px||auto||&#8221; custom_padding=&#8221;28px|||||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.0.7&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/mapindoor.eu\/wp-content\/uploads\/2021\/08\/LinkedIn-1.jpg&#8221; title_text=&#8221;LinkedIn&#8221; _builder_version=&#8221;4.9.11&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][et_pb_text _builder_version=&#8221;4.11.4&#8243; custom_padding=&#8221;||1px|||&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]One of the biggest risks when renovating an existing building is any structural damage that may occur to neighboring buildings. In order to avoid subsequent discussions and disputes as a builder, it is advantageous to preserve evidence of the as-built condition prior to the start of construction. Their knowledge can be of great benefit to avoid major damage or construction delays.<br \/>\nA defect detection, especially the crack detection, makes sense in the run-up to a construction project of listed buildings, old buildings such as churches, railroad station renovations or buildings near railroad tracks, etc.<\/p>\n<p>MAPINDOOR supports and accompanies you in the preservation of evidence and the determination of defects.<\/p>\n<p>In addition to drones used for visualrecording, settlement measurements are also carried out with a level and total station, and height bolts and markers (reflex and crack markers) are attached. Depending on the customer&#8217;s wishes and requirements, this work can be repeated at intervals in order to maintain consistent documentation.<br \/>\nFor many projects, the challenge is controlling the drone. Indoor drone flight requires a high level of concentration, as manual control is required without GPS.<br \/>\nThe drone flights are successfully carried out by our long-term partner of drone inspec.<\/p>\n<p>www.mapindoor.eu<br \/>\nwww.vokal.de<br \/>\nwww.drohneninspec.de[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the biggest risks when renovating an existing building is any structural damage that may occur to neighboring buildings. In order to avoid subsequent discussions and disputes as a builder, it is advantageous to preserve evidence of the as-built condition prior to the start of construction. Their knowledge can be of great benefit to [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4761,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-6606","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-public"],"_links":{"self":[{"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/posts\/6606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/comments?post=6606"}],"version-history":[{"count":5,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/posts\/6606\/revisions"}],"predecessor-version":[{"id":10486,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/posts\/6606\/revisions\/10486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/media\/4761"}],"wp:attachment":[{"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/media?parent=6606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/categories?post=6606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mapindoor.eu\/en\/wp-json\/wp\/v2\/tags?post=6606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}